• Portfolio

    2013 - Republic of Trinidad and Tobago
    Trinidad Piarco International Airport - Tobago International Airport.
    Provision of an Electronic Terrain and Obstacle survey (eTOD) for Piarco & Tobago International Airports.

    2013 - Italy
    Leonardo Da Vinci International Airport
    GPR structural investigation of the RWY 07/25 underpass
    Topographic and architectonic survey directed to the acoustic area delimitation

    2013 - Italy
    Verona Villafranca International Airport
    HWD and GPR survey finalized to the evaluation of thickness and bearing characteristics of the runway 22/04

    2012 - Qatar
    Doha International Airport
    Evaluation of pavement thickness of taxiway Tango through GPR and coring

    2012 - Italy
    Leonardo Da Vinci International Airport
    Tachymetric survey for the evaluation of the pavement roughness indicator "Boeing Bump Index" of the runway 16L/34R, 07/25 and 16R/34L HWD and GPR survey finalized to the thickness and bearing evaluation of slabs of the 400 and 500 sectors

    2011 - Italy
    Tivoli Industrial Area
    Topographic and GPR survey finalized to the localization of pipes network.

    2010 - Italy
    Leonardo Da Vinci International Airport
    Evaluation of pavement thickness of the flexible airport area through GPR and coring
    Evaluation of bearing and roughness characteristics of runway 16L/34R, 16R/34L strips through DCP and LFWD tests
    Survey and mapping of the illumination level of the apron area in accordance to ICAO annex

    From 2010 annually - Italy
    Leonardo Da Vinci International Airport
    Evaluation of Pavement Condition Index (PCI) of concrete slab of the apron area

    2009 - Italy
    G.B. Pastine International Airport
    Tachymetric survey for the slope evaluation of the concrete slab

    2006 - Italy
    Leonardo Da Vinci International Airport
    Aerial survey of the whoole airport area and neighboring area (about 20000 ha)


    From 2004 annually - Italy
    Leonardo Da Vinci International Airport
    Geometric monitoring of the subsidence process of the runway 16L/34R, 16C/34C and taxiway Charlie through high precision digital level

    2004 - Italy
    Brescia G. D'Annunzio International Airport
    Topographic survey of the new cargo area

    2002 - Italy
    Bologna "G.Marconi" Airport
    Tachymetric survey for design purpose of the runway 12/30 extension

    2001 - Italy
    Genova C.Colombo Airport
    Tachymetric survey of the runway 10/28

    From 2001 - Italy
    Leonardo Da Vinci International Airport
    Survey and creation of database obstacles for the runway 07/25, 16L/34R, 16R/34L, 16C/34C.

    2000 - South Africa
    Johannesburg International Airport
    Topographic survey of the whole airport ground (about 173 ha)

    2000 - South Africa
    Durban International Airport

    1981
    Ministry of Communication - Road Department (Libya) for I.C.R. International S.p.A.
    Tracking, road yard support and accounting of Giosh - Haraba road construction.

    1980 - 1981
    Constantina railways (Algeria) for Cogefar S.p.A.
    60 Km railway board tracking.

    1981 - LIBYA
    Ministry of Communications. Road Department
    Tracking, road yard support and accounting of Giosh - Haraba road construction.

    1979 - 1980
    Tripoli Police Academy (Algeria) for Studio Arch. Ferrini e Valle
    Roadnet and buildings tracking; water channel, drainage system and storm sewer design.

    1979
    Plateau State (Nigeria) for Italconsult S.p.A.

    1978
    Ishtar Sheraton Hotel (Iraq) for ICR International S.p.A.
    Building trackings

    1976
    Polyvalent Space of industrial specialization (Algeria) for Comerint S.p.A.
    Road network, water channel and drainage system design. Road tracking.
    City sewer system (Senegal) for Italconsult S.p.A.
    Tracking in the following cities: ...
    400km total tracking

    1974 - 1976
    Agricultural colonization: 3.000 hectares (Libya) per Italconsult S.p.A. e ITL Italiana Lavori S.p.A.
    Irrigation system, road network and electric network trackings..

    1974
    Tomatos and fruits packing house of Costantina (Algeria) for Generale Impianti S.p.A.
    Road network design. Drainage system and storm sewer design. Trackings and general planning.

    1972
    Laboratory school of Buraydah (Saudi Arabia) per Italconsult S.p.A.
    Road network, drainage system and storm sewer design.

    1971
    Lusaka Airport (Zambia) for Società Italiana Condotte S.p.A.
    - General planning tracking. Drainage system and storm sewer design.



  • get in touch
© 2013 - Viale Giuseppe Sirtori, 56 - 00149 Roma (RM)  |  P.IVA: 09842211006 Boxer Sign